The universal cache of IDE devices.
Step 2:
1) Realized cache ATAPI device (CD\DVD).
2) Lock\Unlock ATAPI device for working with cache.
3) Eject (F70/10) and Load (F70/11) tray of ATAPI device.
4) Application CD_tray for control of tray ATAPI device.